L-6, r. 12.1 - Lottery Scheme Rules

Full text
55. A supplier must
(1)  provide adequate training to organizations to use the electronic scheme;
(2)  store the scheme securely and protect access to them at all times;
(3)  resolve any technical difficulties that occur during the drawing and affect its integrity;
(4)  monitor the scheme and intervene during any unusual or suspicious activity;
(5)  monitor and detect errors in the scheme and related components; and
(6)  inform the board of any incident that might affect the safety or integrity of the scheme or drawing, and of the measures taken to correct it.
O.C. 1475-2022, s. 55.
In force: 2022-09-01
55. A supplier must
(1)  provide adequate training to organizations to use the electronic scheme;
(2)  store the scheme securely and protect access to them at all times;
(3)  resolve any technical difficulties that occur during the drawing and affect its integrity;
(4)  monitor the scheme and intervene during any unusual or suspicious activity;
(5)  monitor and detect errors in the scheme and related components; and
(6)  inform the board of any incident that might affect the safety or integrity of the scheme or drawing, and of the measures taken to correct it.
O.C. 1475-2022, s. 55.